Singular Advantage of HIGO Aluminum Frame Laminated Formwork
1,HIGO Formwork Scaffolding System can effectively increase the product life of special-shaped slabs, helping investors to reduce costs as much as possible.
2,Compared with Al-Alloy formwork, HIGO system is much lower in terms of lump sum.
3,IGO has worked out the problem of special-shaped slabs existing in Al-Alloy formwork, thus can be applied in more circumstances.
4,HIGO adopts 100 times of water-based formwork oil. Therefore, no maintenance is required, which can further cut down the cost of raw materials and labor.
Aluminum Frame wood plywood formwork vs Conventional FormworkCompare Plywood Aluminum Frame Laminated Formwork Size Unordered Standardized KN 30KN/m² Uneven 60KN/m² Even Early Removal Hard to operate 3 formworks and 3 scaffoldings Easy to operate 1 formwork and 3 scaffoldings Cycle time 6-7 days , Long without guarantee 3.5-4 days , Short with guarantee/td> Efficiency 10-15 m²/day/person 30-50 m²/day/person Turnover 5-7 times with large waste and loss 100 times ( 600 times for aluminum frame) without waste and loss Labor Labor shortage; professional skill required Adequate service; proficiency required Quality Vulnerable, plastering required Invulnerable, shape at one time, no need to plastering, high quality Wastage Large waste No waste; recyclable Waste Large waste No waste Service charge 25-35RMB/ m² Lower than 25-27RMB/m² Cost reduction on plastering 0 15-25 RMB/m² Price on green construction 2RMB/m² 0 Tower crane Dependent Independent Comparison on economic indicator of common formworksCompare San'an formwork Steel Shuttering Formwork Aluminum Formwork Aluminum Frame Laminated Formwork Material(mm) formwork Steel plate Al-Alloy plate Laminated plywood Thickness(mm) 13/15 5-6 4 12-15 Weight(kg/m² ) 10.5 85-95 20-25 17-25 Weight to load(kg/m² ) 30 80 60 60 Cost(without strut and components) 60RMB 700RMB 1300RMB 800RMB Turnover 6 100 100-200 100-200 Value for recycling No and additional cost on disposal Less More More Operation Hard Normal Easy Easy (without formwork oil) Cost on maintenance Low High Low Low Efficiency Low Normal High High Application () Dependence on machinery Partly dependent dependent independent independent
HIGO Aluminum Frame Laminated Formwork Scaffolding System adopts one ecological and energy-reserved material of new generation developed independently-the polymer laminated bamboo-wood formwork and combines it with Al-Alloy system together. So it not just inherits all the advantages in the Al-Alloy shuttering system. What's more, adhesion caused by certain chemical reaction between aluminum formwork and concrete will not be a problem any more. At the same time, it is also a breakthrough explained by the highly-reduced cost.